arista
06-03-2026, 07:27 PM
It Needs £50 Million in total
to keep it going safely.
From ITV1 London News
the Executive said she will raise £20Million of the funding.
The Reporter went on the Roof
showed a Leak with a temp patch work on it.
Built for the 1951 Festival of Britain
The Labour Party has offered £1.5 million to help them?
https://www.itv.com/watch/news/the-royal-festival-hall-wants-to-keep-the-music-alive-but-poor-conditions-could-force-it-to-shut/81pcssh
to keep it going safely.
From ITV1 London News
the Executive said she will raise £20Million of the funding.
The Reporter went on the Roof
showed a Leak with a temp patch work on it.
Built for the 1951 Festival of Britain
The Labour Party has offered £1.5 million to help them?
https://www.itv.com/watch/news/the-royal-festival-hall-wants-to-keep-the-music-alive-but-poor-conditions-could-force-it-to-shut/81pcssh