Home Menu

Site Navigation


Notices

General Chat General discussion. Want to chat about anything not covered in another forum - This is the place!

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 12-03-2005, 03:33 PM #1
cc100's Avatar
cc100 cc100 is offline
Legendary Senior Member
 
Join Date: Apr 2002
Posts: 4,070


cc100 cc100 is offline
Legendary Senior Member
cc100's Avatar
 
Join Date: Apr 2002
Posts: 4,070


Default £100m tunnel to Orkney \'feasible\'

£100m tunnel to Orkney 'feasible'
Thu 10 Mar 2005

Scotsman

LESS than ten miles long and costing about £100 million, a tunnel taking drivers under the sea to Orkney is increasingly being seen as a realistic possibility.

The idea took a small but significant step towards reality yesterday when a Norwegian tunnelling expert outlined a vision of a crossing beneath the Pentland Firth connecting the islands to the Scottish mainland.

Councillors from both sides now look likely to investigate whether a 9.3-mile tunnel would be more cost effective than the hour-long ferry service between Orkney and Caithness which is subsidised by the Scottish Executive.

It is estimated that in 20 years it will cost about £50 million to replace the Hamnavoe, the NorthLink Ferries vessel that sails between Stromness and Scrabster.

Captain Bob Sclater, Orkney Islands Council’s transportation chairman, said: "It seems to be the way ahead. It would mean people could come and go whenever they wanted, with no restriction on travel.

"From what we’ve been told, a tunnel from Orkney to the Scottish mainland would be a feasible option."

John Green, who represents north-east Caithness on Highland Council, said: "When you consider that around £11 million a year in subsidy goes into the Pentland Firth route - it wouldn’t take long to recoup that by building a tunnel."

It was thought a sub-sea tunnel linking South Ronaldsay in Orkney to a point close to John o’ Groats, would cost at least £150 million.

But Eivind Grøv, a senior consultant with the Norwegian civil and environmental engineering specialist SINTEF, predicted construction costs of about £6 million a kilometre and a total bill of about £100 million.
cc100 is offline   Reply With QuoteReply With Quote
 

Bookmark/share this topic

Tags
feasible, orkney, tunnel, £100m


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 01:34 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.
 

About Us ThisisBigBrother.com

"Big Brother and UK Television Forum. Est. 2001"

 

© 2023
no new posts